Source Notes
Chapter 15: Putting It All Together: LC-39 Site Activation
1.
KSC, "Apollo/Saturn V Facility Activation Plan," 3rd Coordination Draft, 30 Dec. 1965; Petrone interview, 17 Sept. 1970; "Presentation of the NASA Oversight Subcommittee, Committee on Science and Astronautics, House of Representatives," 29 Oct. 1968, pp. 38-57.
2.
William T. Clearman, Jr., to T. A. Strong, "Lt. Col. Donald R. Scheller, USAF (NASA)," 12 Oct. 1964; Clearman interview, 13 Sept. 1973.
3.
KSC, "Minutes of Apollo/Saturn V Site Activation Board Meeting #1," 19 Mar. 1965.
4.
KSC,
LC-39 Site Activation Master Schedule (Preliminary), Level A
, rev. 17 Feb. 1967.
5.
KSC, "Minutes of Site Activation Board Meeting #1"; "Presentation to the NASA Oversight Subcommittee," 29 Oct. 1968, pp. 43-44.
6.
Gruene to Apollo/Saturn V Test Off., "Comments on Site Activation Board Charter," 1 Apr. 1965.
7.
Bagnulo to Scheller, "Site Activation Board Charter," 30 Mar. 1965.
8.
8. Clark to Scheller, "Comments on Apollo/Saturn V Site Activation Board," 31 Mar. 1965 .
9.
KSC, "Minutes of Apollo/Saturn V Site Activation Board Meeting #3," 5 Aug. 1965.
10.
Donald R. Scheller, "Management by Exception, Activation of Apollo/Saturn V Launch Complex 39," 15 May 1967; "Presentation to the NASA Oversight Subcommittee," 29 Oct. 1968, pp. 41-42.
11.
L. S. Harris, Chief, Site Operation Gp., Engineering and Development Dir., KSC, to Bagnulo, "Activation Projects, LC-39," 23 Sept. 1965, in KSC Engineering and Development Dir. Reading Files, 1965-66; "Minutes of KSC Site Activation Working Group Meeting #1," 3 Dec. 1965; Scheller to SAB, "Apollo/Saturn V SAB Management Meeting Membership," 19 Jan. 1966.
12.
Scheller, "Management by Exception"; Clearman interview, 26 Oct. 1973; Fulton interview; Chandler interview.
13.
Boeing Atlantic Test Center Management Systems Staff, "ERS Recovery Plan," by A. J. Culver and K. G. Baird, Apr. 1966.
14.
Scheller, "Management by Exception"; Murphy interview.
15.
Petrone's notes, 14 Feb. 1963; Wagner interview, 21 Sept. 1973; Gassman interview;
NASA Apollo Inter-Center ICD Management Procedure
, report CM-001-001-1B, Jan. 1969, pp. 3-4.
16.
Petrone, "KSC Apollo/Saturn Configuration Management Program Directive," 29 Sept. 1965, Management Configuration Off. files.
17.
KSC Apollo Program Directive No. 2, 9 Dec. 1965.
18.
Gassman interview; Leet interview, 8 Nov. 1973.
19.
KSC/MSC,
ICD-IRN Processing
, 6 May 1968; Wagner interview, 21 Sept. 1973.
20.
Petrone to Poppel, "VLF-39 Facility Checkout Vehicle Minimum Requirements and Operational Characteristic," 1 Mar. 1962; Poppel (signed by Owens) to Petrone. "Minimum Requirements for Facility Checkout Vehicle for Complex 39," 2 Apr. 1962.
21.
Phillips to NASA Manned Space Flight Centers, "Apollo Delivery and Launch Schedules," 16 Feb. 1965; Phillips to NASA Manned Space Flight Centers, "Apollo Schedules and Mission Assignments," 12 Jan. 1965, in Phillips file, NASA Hq. History Off.; KSC, Plans, Program, and Resources Dir., "Verification of '500-F' Schedule Dates Based upon OMSF Approved Apollo Schedule," 10 Mar. 1966.
22.
Petrone to Arthur Rudolph, Saturn V Program Manager, MSFC, 11 Jan. 1966.
23.
Haggard interview; "Marion Power and Shovel Company, PMSLC Hearing, Miami. Florida, May 1965," contract NASA 10-477, KSC Labor Relations Off.
24.
Michael E. Haworth, Jr., NASA Contracting Off., to Marion Power Shovel, "Contract NAS 10-477," 25 Jan. 1965.
25.
Clearman to Petrone, Weekly Notes of 25 June 1965.
26.
George W. Waiter,
Modifications to Bearings for Traction Support Rollers on Crawler-Transporters
, report KSC TR-260-D, 15 Dec. 1965, pp. 1-2; KSC Weekly Notes, Poppel, 29 July 1965; F. Jones, Technical Supervisor, to Richard McCoy, "Contract AS 10-477, Salvage of Bearings," 26 Oct. 1965.
27.
Waiter,
Modifications to Bearings
, p.2; "KSC Press Briefing and Crawler Demonstration," 25 Jan. 1966, pp. 3-4, 12.
28.
M. E. Haworth to Patrick Kraft, Treasurer, Marion Power Shovel Co., 15 June 1965.
29.
M. E. Haworth to F. Boyle, Pres., Marion Power Shovel Co., "NAS 10-477," 14 Oct. 1965; Gordon Harris, Chief of Public Affairs, to Debus, 30 Sept. 1965.
30.
Morgan F. Jones to Poppel, 15 Nov. 1965; Poppel, "Weekly Notes to Debus," 8 Oct. 1965; "Technical Progress Reports," Third Quarter 1965, pp. 3-16; Buchanan interview, 4 Oct. 1974; Waiter,
Modifications to Bearings
, p. 12; "KSC Press Briefing and Crawler Demonstration," 25 Jan. 1966, pp. 16-17.
31.
KSC Weekly Notes, Poppel, 3, 10 Dec. 1965; Bagnulo, 17 Dec. 1965;
Spaceport News
, 3 Feb. 1966.
32.
NASA,
PERT, Program Evaluation and Review Technique, Handbook
, NPC-101, 1 Sept. 1961; "KSC Presentation to the NASA Oversight Subcommittee, Committee on Science and Astronautics," 29 Oct. 1968, pp. 38-58; Potate interview, 6 June 1972.
33.
"Minutes of Apollo/Saturn V Site Activation Board Meeting #3," 5 Aug. 1965; KSC Weekly Notes, Petrone, 30 July 1965.
34.
L. Steven Harris to Bagnulo, "Site Activation Board Meeting," 28 Oct. 1965, in Engineering and Development Dir. reading files, 1965-1966; Wiley interview, 31 Oct. 1973.
35.
Petrone to Phillips, 4 Nov. 1965.
36.
Petrone to Phillips, "Proposed SA500-F-l/501 Work Around Schedule," 7 Dec. 1965.
37.
KSC Weekly Notes, Bagnulo, 17 Nov. 1965; Bagnulo to Debus and others, "Pad A Settlement," 9 Dec. 1965; Roberts interview.
38.
"Minutes of Apollo/Saturn Site Activation Board Meeting #14," 6 Jan. 1966; "LC-39 Site Activation Master Schedule Meeting," 17 Jan. 1966.
39.
Potter interview; Steven Harris interview; Tom Wills interview; "Reading File of Engineering Division's Site Activation Group," Sept. 1965, Steven Harris's files, KSC.
40.
"Minutes of Apollo/Saturn V Site Activation Board Meeting #16," 3 Feb. 1966; KSC, "PERT Analysis Report," 20 Jan. 1966.
41.
Clearman, Weekly Notes to Petrone, 7 Jan., 4, 18, 25 Feb., 3 Mar. 1966.
42.
Clearman, Weekly Notes to Petrone, 3, 25 Mar., 1, 15 Apr. 1966.
43.
"LC-39 Site Activation Status Reports," weekly for March and April 1966; Brewster interview; Hahn interview.
44.
"LC-39 Site Activation Status Report," 27 Apr. 1966; Hahn interview.
45.
"LC-39 Site Activation Status Reports," weekly reports for Mar. 1966; Weekly Notes, Bagnulo, 25 Mar. 1966;
Spaceport News
, 10, 31 Mar. 1966.
46.
Rigell interview; "LC-39 Site Activation Weekly Reports," Mar., Apr. 1966.
47.
"LC-39 Site Activation Reports," 13 Apr., 5 May, 3 Aug. 1966.
48.
"Minutes of Apollo/Saturn V Site Activation Board Meeting #24," 26 May 1966;
Spaceport News
, 26 May 1966.
49.
"Minutes of Apollo/Saturn V Site Activation Board Meeting #25," 16 June 1966;
Spaceport News
, 16 June 1966.
50.
"Minutes of Apollo/Saturn V Site Activation Board Meetings" 25, 26, and 27, dated 16, 23 June, 7 July 1966.
51.
Barfus interview; Enlow interview; Sparkman interview, 6 Dec. 1973.
52.
"Minutes of Apollo/Saturn V Site Activation Board Meeting #27," 7 July 1966.
53.
"Minutes of Apollo/Saturn V Site Activation Board Meetings" 27 and 28, dated 7 and 21 July 1966;
Spaceport News
, 4 Aug. 1966.
54.
"Minutes of Apollo/Saturn V Site Activation Board Meetings" 28 and 29, 21 July, 4 Aug. 1966.
55.
William I. Moore and Raymond J. Arnold, "Failure of Apollo/Saturn V Liquid Oxygen Loading System," 1967 Cryogenic Engineering Conference, 21-23 Aug. 1967, Stanford Univ., CA, paper K-1, in
Advances in Cryogenic Engineering
13 (1967): 534-44; Boeing Atlantic Test Center, "Technical Report of Complex 39A LOX System Failure, 10 Sept. 1966"; "Fund Board of Inquiry Findings on Failure of LOX Distribution System - 19 Aug. 1966," J. G. Shinkle, Chairman; "Presentation to the Congressional Subcommittee on Manned Space Flight," pp. 114-19.
56.
Moore and Arnold, "Failure of LOX Loading System," pp. 534-44; "Presentation to the Subcommittee on Manned Space Flight," pp. 114-19.
57.
"LC-39 Site Activation Status Reports," weekly for Sept., Oct. 1966.
58.
Robert Hotz,
Aviation Week and Space Technology
, 22 Mar. 1965, p. 11.
59.
"KSC Presentation to the NASA Oversight Subcommittee," 29 Oct. 1968; Petrone interview, 17 Sept. 1970.