Main Index
Previous
Next
Image Index
Assembly
25/05/1966
Apollo/Saturn V Facilities Test Vehicle move from VAB on way to Pad A
01/03/1967
Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
01/03/1967
Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
01/06/1967
Apollo Spacecraft 012 hoisted to top of gantry at Pad 34
01/06/1967
Apollo Spacecraft 012 hoisted to top of gantry at Pad 34
12/06/1967
Apollo Spacecraft 020 Command Module readied for mating with Service Module
20/06/1967
Apollo Spacecraft 017 moved for mating with Saturn V launch vehicle
22/11/1967
Mating of Lunar Module-1 with Spacecraft Lunar Module Adapter-7
12/03/1968
First stage of Saturn launch vehicle in KSC Vehicle Assembly Building
08/05/1968
Apollo Spacecraft 101 Command/Service Modules being moved for mating
13/01/1969
Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
13/01/1969
Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
31/01/1969
Interior view of KSC's Manned Spacecraft Operations Building
31/01/1969
Interior view of KSC's Manned Spacecraft Operations Building
04/04/1969
Lunar Module 5 ascent stage being moved for mating with adapter
06/04/1969
Lunar Module 5 mated with Spacecraft Lunar Module Adapter (SLA)
02/06/1969
Hi-Bay 2 of KSC's Vehicle Assembly Building with Apollo spacecraft 106
23/06/1969
Lunar Module 6 being moved to integration work stand
Please support this web site:
Cafe Press Apollo Explorer Store
Apollo Explorer Bookstore
Make a donation
Email
darren@apolloexplorer.co.uk