Image Index
Facilities
- 01/01/1962 Aerial view of the future site of the Manned Spacecraft Center, Houston, Tx
- 15/01/1962 Astronaut Scott Carpenter in Hanger S crew quarters during suiting exercise
- 10/05/1962 Astronaut Walter Schirra suited-up prior to MA-8 flight
- 10/05/1962 Astronaut Walter Schirra is assisted into his Sigma 7 spacecraft
- 10/05/1962 Astronaut Walter Schirra is assisted into his Sigma 7 spacecraft
- 10/05/1962 Astronaut Walter Schirra leaves transport van for Pad 14 and MA-8 mission
- 24/05/1962 Astronaut Scott Carpenter leaving White Room for launch site
- 09/10/1962 Astronaut L. Gordon Cooper on weight and balance scale
- 14/12/1962 Astronaut Walter Schirra during suiting-up exercise prior to MA-8 flight
- 02/01/1963 Astronaut Gordon Cooper carrying portable air conditioner in Hanger S
- 12/01/1963 Astronaut Walter Schirra leaves Hanger "S" prior to MA-8 flight
- 26/09/1963 Aerial view of construction progress at the Manned Spaceflight Center
- 12/12/1963 Aerial view of construction progress at the Manned Spaceflight Center
- 23/12/1963 Aerial oblique artist concept of the Merritt Island Launch Complex
- 31/08/1964 Site for the Manned Spacecraft Center in Houston prior to ground breaking
- 24/11/1964 Astronauts Young, Schirra, Stafford and Grissom during egress training
- 02/12/1964 Astronaut Scott Carpenter in Hanger S crew quarters during suiting activity
- 11/02/1965 Gemini 6 prime crew in white room atop Pad 19 during Gemini 6 countdown
- 16/03/1965 Astronauts Young and Grissom during water egress training
- 17/03/1965 Gemini 3 spacecraft being hoisted to white room above launch vehicle
- 06/04/1965 Views of Gemini 5 experiments involving visual acuity
- 12/04/1965 Astronaut Frank Borman in suiting trailer during prelaunch countdown
- 12/04/1965 Astronauts Borman and Lovell are seen in Gemini 7 spacecraft
- 12/04/1965 Gemini 7 prime crew during suiting up procedures at Launch Complex 16
- 12/04/1965 Gemini 7 prime crew leaves suiting trailer during prelaunch countdown
- 12/04/1965 Astronaut James Lovel in suiting trailer during prelaunch countdown
- 29/04/1965 Nighttime scene of Gemini spacecraft being hoisted to top of Pad 19
- 04/05/1965 Astronaut John Young assisted into Gemini spacecraft in white room
- 04/05/1965 Astronauts Shepard and Young riding elevator to white room atop Pad 19
- 05/05/1965 Astronaut Scott Carpenter in Hanger S crew quarters during suiting exercise
- 08/06/1965 Astronauts Cooper and Conrad during simulation exercise for Gemini 5 mission
- 07/07/1965 View of facilities at the Manned Spaceflight Center
- 19/08/1965 Astronauts Conrad and Cooper during suiting up operations
- 21/08/1965 Astronauts Cooper and Conrad walk up gantry ramp at Pad 19 during countdown
- 21/08/1965 Astronauts Cooper and Conrad walk up gantry ramp at Pad 19 during countdown
- 21/08/1965 Astronauts Cooper and Conrad arrive in white room at Pad 19 during countdown
- 21/08/1965 Gemini 5 prelaunch countdown showing astronauts in white room
- 21/08/1965 Gemini 5 prelaunch countdown showing astronauts in white room
- 21/08/1965 Astronauts Cooper and Conrad in Gemini spacecraft just after insertion
- 30/08/1965 Preflight breakfast for Gemini 5 prime crew
- 09/09/1965 Aerial view of construction progress at the Manned Spaceflight Center
- 25/10/1965 Astronauts Stafford and Schirra at breakfast before Gemini 6 mission
- 03/11/1965 Gemini 3 spacecraft being mated with Titan II launch vehicle
- 15/11/1965 Technicians assist Gemini 7 prime crew in systems checks
- 27/11/1965 Gemini 7 backup crew seen in white room during Gemini 7 simulation activity
- 15/12/1965 Astronauts Stafford and Schirra at breakfast before Gemini 6 mission
- 15/12/1965 Gemini 6 prime crew seen in the Gemini 6 spacecraft prior to launch
- 15/12/1965 Gemini 6 prime crew in white room atop Pad 19 during Gemini 6 countdown
- 19/12/1965 Gemini 6 crew greets returning Gemini 7 crew
- 02/01/1966 Astronaut David Scott practicing for Gemini 8 EVA
- 03/01/1966 Apollo astronauts participate in classroom instruction at MSC
- 06/01/1966 Crew of the first manned Apollo mission practice water egress procedures
- 06/01/1966 Crew of the first manned Apollo mission practice water egress procedures
- 07/01/1966 Astronauts Young and Collins beside suiting trailer during preflight activity
- 09/01/1966 Backup Crew of the first manned Apollo mission practice water egress
- 20/01/1966 View of new centrifuge at Flight Acceleration Facility
- 19/02/1966 Astronaut Eugene Cernan has suit adjusted prior to tests with AMU
- 21/02/1966 Closeup exterior view of Dynamic Crew Procedures Trainer
- 06/03/1966 Astronauts Stafford and Cernan arrive in the White Room atop Pad 19
- 06/03/1966 Fish-eye view of Astronauts Stafford and Cernan in the White Room atop Pad 19
- 06/03/1966 Gemini 9 astronauts during suiting up for mission
- 06/03/1966 Gemini 9 astronauts walk up ramp to launch pad
- 06/03/1966 Fish-eye view of Astronauts Stafford and Cernan in the White Room atop Pad 19
- 06/03/1966 Gemini 9 astronauts leave suiting trailer for launch pad
- 06/03/1966 Gemini 9 crew in spacecraft with technicians closing hatches
- 06/03/1966 Astronauts Stafford and Cernan during preflight breakfast
- 16/03/1966 Astronaut Neil Armstrong in Launch Complex 16 trailer during suiting up
- 16/03/1966 Gemini 8 prime crew and other astronauts at prelaunch breakfast
- 16/03/1966 Astronaut David R. Scott in Gemini 8 spacecraft during countdown
- 16/03/1966 Astronaut David R. Scott in Launch Complex 16 trailer during suiting up
- 16/03/1966 Astronaut David R. Scott in Launch Complex 16 trailer during suiting up
- 16/03/1966 Astronaut Neil A. Amrstrong in Gemini 8 spacecraft during countdown
- 18/04/1966 View of Spacecraft 012 Command Module during installation of heat shield
- 01/05/1966 Astronaut David Scott undergoes water egress training in building 260A
- 17/05/1966 Astronauts Cernan and Stafford discuss postponed flight in White Room
- 19/05/1966 Gemini Augmented Target Docking Adapter during pre-flight checkout
- 25/05/1966 Sunrise at Pad 39A during checkout of facilities
- 25/05/1966 Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower
- 25/05/1966 Apollo/Saturn V Facilities Test Vehicle move from VAB on way to Pad A
- 09/06/1966 Astronaut James Lovell prior to entering Gemini Mission Simulator
- 24/06/1966 Prime crew of first Apollo manned flight inspect spacecraft equipment
- 24/06/1966 Astronaut Virgil Grissom inspects spacecraft equipment during visit to NAA
- 09/07/1966 Cutaway view of Sapmle Operations Area of Lunar Receiving Laboratory
- 13/07/1966 Fish-eye view of Astronauts Collins and Young walking down ramp at Pad 19
- 18/07/1966 Astronauts Young and Collins walk up ramp at Pad 19 during countdown
- 18/07/1966 Gemini 10 prime crew in White Room preparing for insertion
- 18/07/1966 Gemini 10 prime crew in suiting trailer during Gemini 10 prelaunch countdown
- 18/07/1966 Astronauts Young and Collins undergo suiting up operations during countdown
- 15/08/1966 A stage of the uprated Saturn 1 launch vehicle arrives by barge at Cape Kennedy
- 22/08/1966 Prime crew of Apollo/Saturn Mission 204 at North American's Downey Facility
- 24/08/1966 View of Spacecraft 012 Command Module during pre-shipping operations
- 05/10/1966 Astronaut Eugene Cernan sits in Launch Complex 16 suiting trailer
- 05/10/1966 Astronaut Thomas Stafford sits in Launch Complex 16 suiting trailer
- 05/10/1966 Astronauts Stafford and Cernan during Gemini 9/Agena Launch demonstration
- 07/10/1966 Aerial view of construction progress at the Manned Spaceflight Center
- 08/10/1966 Astronaut Richard Gordon practices attaching camera to film EVA
- 09/10/1966 Astronauts Conrad and Gordon talk with technicians in the White Room
- 18/10/1966 Astronaut Edward White receives help from technician during tests at KSC
- 18/10/1966 NASA suit technicians assist Astronaut Virgil Grissom during suiting
- 11/11/1966 Gemini 12 prime crew walk up ramp at Pad 19 during prelaunch countdown
- 11/11/1966 Technicians prepare to close hatches on Gemini 12 spacecraft
- 11/11/1966 Astronauts Lovell and Aldrin leave suit trailer during prelaunch countdown
- 11/11/1966 Astronaut Edwin Aldrin in the White Room atop Pad 19 during countdown
- 11/11/1966 Gemini 12 prime crew leave suiting trailer at Launch Complex 16
- 16/11/1966 Astronauts Lovell and Aldrin shake hands in front of Gemini progress sign
- 07/12/1966 Gemini 10 prime crew participate in Simultaneous Launch Demonstration
- 07/12/1966 Astronaut Michael Collins during Simultaneous Launch Demonstration
- 09/12/1966 Astronaut Richard Gordon during suiting up operations prior to mission
- 09/12/1966 Gemini 11 prime crew in Launch Complex 16 suiting trailer
- 09/12/1966 Astronaut Charles Conrad recieves help in suiting up before mission
- 09/12/1966 Astronaut Richard Gordon recieves help in suiting up before mission
- 01/01/1967 Artist's drawing ilustrating functional areas of LRL
- 01/01/1967 Artist's concept first floor layout of Support Laboratory of LRL
- 03/01/1967 Artist's concept of equipment in Primary Vacuum Laboratory of LRL
- 03/01/1967 Artist's drawing illustrating transportation to and from the LRL
- 03/01/1967 Cutaway view of radiation counting laboratory in LRL
- 08/01/1967 Dynamic Crew Procedures Trainer
- 28/01/1967 Closeup view of Apollo Spacecraft 012 Command Module after flash fire
- 28/01/1967 Closeup view of Apollo Spacecraft 012 Command Module after flash fire
- 01/03/1967 Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
- 01/03/1967 Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
- 12/06/1967 Apollo Spacecraft 020 Command Module readied for mating with Service Module
- 20/06/1967 Apollo Spacecraft 017 moved for mating with Saturn V launch vehicle
- 22/06/1967 Press room of the Crew reception Area, Lunar Receivng Laboratory
- 22/06/1967 Crew Reception Area of Lunar Receiving Laboratory
- 22/06/1967 Astronaut living quarters in Crew Reception Area of Lunar Receivng Laboratory
- 01/11/1967 Views of the Apollo Lunar Module Mission Simulator
- 22/11/1967 Mating of Lunar Module-1 with Spacecraft Lunar Module Adapter-7
- 01/01/1968 Artist's concept of layout of the Support Laboratory of the LRL
- 01/01/1968 Artist's concept of layout of the Crew Reception Area in the LRL
- 03/01/1968 Biological Test Laboratory, Sample Operations Area
- 05/01/1968 Prime crew of the Apollo 7 space flight
- 11/01/1968 Apollo 8 prime crew stand beside gondola for centrifuge training
- 11/01/1968 Astronaut Frank Borman suited up for centrifuge training
- 11/01/1968 Apollo 8 prime crew inside centrifuge gondola in bldg 29 during training
- 11/01/1968 Apollo 9 prime crew participate in water egress training
- 11/01/1968 Two members of Apollo 8 crew suited up for centrifuge training
- 23/01/1968 View of Lunar Module Mission Simulator in bldg 5
- 12/03/1968 First stage of Saturn launch vehicle in KSC Vehicle Assembly Building
- 12/03/1968 Apollo spacecraft Command/Service Module and Lunar Module 3 arrive at VAB
- 14/03/1968 Land impact test of the Apollo Command Module at MSC
- 14/03/1968 Land impact test of the Apollo Command Module at MSC
- 15/03/1968 Technician using wire saw in Thin Section laboratory
- 05/04/1968 Gamma ray detector, withdrawn from inner anticoincidence mantle
- 08/05/1968 Apollo Spacecraft 101 Command/Service Modules being moved for mating
- 02/06/1968 Apollo 6 stack and mobile launch tower leaving VAB on way to launch pad
- 14/06/1968 Ascent stage of Lunar Module 3 being uncrated and moved
- 27/08/1968 Interior view of Manned Spacecraft Operations Bldg with Lunar Module-3
- 10/09/1968 Apollo 8 prime crew in foreground as spacecraft leaves VAB on way to pad
- 10/09/1968 Apollo 8 vehicle on way to Pad A, Launch Complex 39
- 10/09/1968 Apollo 8 spacecraft on way from VAB to Pad A, Launch Complex 39
- 10/11/1968 Apollo 7 prime crew goes through suiting up operations prior to launch
- 10/11/1968 Overall view of Mission Control on first day of Apollo 7 space mission
- 20/11/1968 Interior view of Manned Spacecraft Operations Bldg with Lunar Module-3
- 30/11/1968 Interior Manned Spacecraft Operations Bldg as Command/Service module moves
- 21/12/1968 Apollo 8 crew leaves Manned Spacecraft Operations Bldg during countdown
- 13/01/1969 Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
- 13/01/1969 Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
- 31/01/1969 Interior view of KSC's Manned Spacecraft Operations Building
- 31/01/1969 Interior view of KSC's Manned Spacecraft Operations Building
- 23/02/1969 Apollo 9 crew prepares to participate in Countdown Demonstration Test
- 23/02/1969 View of White Room atop Pad A during Apollo 9 Countdown Demonstration Test
- 23/02/1969 Firing Room 2 in Launch Control Center at KSC during Apollo 9 countdown test
- 27/02/1969 Interior view of Mobile Quarantine Facility with Apollo 11 crewmembers
- 01/03/1969 Aerial view of Apollo 9 space vehicle on way from VAB to Pad A
- 03/03/1969 Apollo 9 crew leaves Spacecraft Operations Building during countdown
- 03/03/1969 Technicians prepare to insert Apollo 9 crew during Countdown Demonstration
- 06/03/1969 Astronaut Eugene Cernan and Edwin Aldrin during Apollo 10 debriefing
- 06/03/1969 Apollo 10 and 11 crews photographed during Apollo 10 debriefing
- 06/03/1969 Apollo 10 and 11 crews photographed during Apollo 10 debriefing
- 24/03/1969 Apollo 11 prime crew during manned altitude chamber test activity
- 01/04/1969 Lunar Module 5 ascent stage in Final Assembly area on overhead hoist
- 04/04/1969 Lunar Module 5 ascent stage being moved for mating with adapter
- 06/04/1969 Lunar Module 5 mated with Spacecraft Lunar Module Adapter (SLA)
- 08/04/1969 Apollo 11 lunar sample no. 10046
- 08/04/1969 Second Apollo 11 sample return container in Vacuum Laboratory
- 18/04/1969 Astronaut Neil Armstrong participates in lunar surface simulation training
- 18/04/1969 Astronaut Neil Armstrong participates in lunar surface siumlation training
- 18/04/1969 Astronaut Neil Armstrong participates in lunar surface siumlation training
- 22/04/1969 Apollo 11 cremembers participates in simulation of moon's surface
- 22/04/1969 Astronaut Neil Armstrong participates in simulation of moon's surface
- 22/04/1969 Apollo 11 crewmembers participates in simulation of moon's surface
- 22/04/1969 Apollo 11 crewmembers participates in simulation of moon's surface
- 08/05/1969 View of lunar rocks contained on second Apollo 11 sample return container
- 13/05/1969 Firing Room 3 of Launch Control Center, Launch Complex 39 countdown test
- 13/05/1969 Apollo 10 astronauts during Countdown Demonstration Test at KSC
- 13/05/1969 Astronaut Thomas Stafford during Countdown Demonstration Test at KSC
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Apollo 10 astronauts during preflight operations for Apollo 10 mission
- 02/06/1969 Hi-Bay 2 of KSC's Vehicle Assembly Building with Apollo spacecraft 106
- 05/06/1969 Apollo 10 astronauts leave Manned Spacecraft Operations Bldg for launch pad
- 23/06/1969 Lunar Module 6 being moved to integration work stand
- 28/06/1969 Astronaut Michael Collins inside Apollo Command Module mockup in training
- 30/06/1969 Apollo 12 spacecraft arrives at VAB during preflight preparations
- 05/07/1969 Astronaut Neil Armstrong during thermovacuum training
- 10/07/1969 Apollo 12 prime crew during spacecraft checkout at Rockwell Downey
- 16/07/1969 Apollo 11 crewmen during prelaunch countdown
- 16/07/1969 Apollo 11 crewmen during prelaunch countdown
- 25/07/1969 Dr. Grant Heikan examines lunar material in sieve from sample container
- 25/07/1969 First Apollo 11 sample return containers unloaded at Lunar Receiving Lab.
- 25/07/1969 First Apollo 11 sample return containers arrive at Ellington AFB
- 25/07/1969 First direct exposure to lunar material for Crew Reception personnel
- 25/07/1969 First Apollo 11 sample return containers unloaded at Lunar Receiving Lab.
- 26/07/1969 Closeup view of lunar rocks contained in first Apollo 11 sample container
- 26/07/1969 Closeup view of lunar rocks contained in first Apollo 11 sample container
- 26/07/1969 Closeup view of lunar rocks contained in first Apollo 11 sample container
- 26/07/1969 Offloading of the Mobile Quarantine Facility in Hawaii
- 27/07/1969 Mobile Quarantine Facility unloaded at Ellington Air Force Base, Texas
- 27/07/1969 Mobile Quarantine Facility unloaded at Ellington Air Force Base, Texas
- 27/07/1969 Apollo 11 crewmen during first postflight debriefing
- 27/07/1969 Mobile Quarantine Facility unloaded at Ellington Air Force Base, Texas
- 30/07/1969 Apollo 11 crewmen dining in Crew Reception area of Lunar Receiving Lab
- 09/08/1969 Ground level view of Launch Complex 39 and Apollo 12 spacecraft
- 09/08/1969 High-angle view of Launch Complex 39 and Apollo 12 spacecraft
- 30/09/1969 Progress photograph of sample experiments being conducted with lunar material
- 30/09/1969 Progress photograph of sample experiments being conducted with lunar material
- 12/10/1969 Astronaut Charles Conrad during ceremonies after release from quarantine
- 24/10/1969 Astronaut Alan Bean participates in lunar surface simulation
- 28/10/1969 Nighttime, ground level view of Launch Complex 39 and Apollo 12 spacecraft
- 03/11/1969 Apollo 10 roll out to Pad B, Launch Complex 39, Kennedy Space Center
- 03/11/1969 Aerial view of Launch Complex 39, KSC showing Apollo 10 on way to Pad B
- 04/11/1969 View of Apollo Spacecraft 107 Command and Service Modules at KSC
- 14/11/1969 Astronaut Alan Bean suits up during Apollo 12 prelaunch countdown
- 14/11/1969 White room atop Pad A, Launch Complex 39 during insertion of Apollo 12 crew
- 14/11/1969 Apollo 12 crewmem leave Operations Building for Launch pad
- 14/11/1969 Astronaut Richard F. Gordon suits up during Apollo 12 prelaunch countdown
- 19/11/1969 Activity in Mission Control Center during Apollo 12 lunar landing mission
- 24/11/1969 U.S.S. Hornet crewmen greeted by crew of Apollo 12 lunar landing mission
- 24/11/1969 Apollo 12 crew welcomed aboard U.S.S. Hornet by Rear Admiral Donald David
- 29/11/1969 Apollo 12 crewmembers greeted by family on arrival at Ellington
- 06/01/1970 Fused thermal switch from Apollo Service Module oxygen tank after test
- 06/01/1970 Test showing Teflon insulation burning in supercritical oxygen earth gravity
- 16/01/1970 Apollo 13 Astronaut James Lovel during lunar surface simulation training
- 17/01/1970 Apollo 13 prime crewmembers during water egress training
- 17/01/1970 Apollo 13 prime crewmembers during water egress training
- 17/01/1970 Apollo 13 Astronaut Fred Haise during water egress training
- 17/01/1970 Apollo 13 Astronaut Thomas Mattingly during water egress training
- 19/01/1970 Apollo 13 Astronaut Fred Haise during lunar surface simulation training
- 19/01/1970 Apollo 13 Astronaut Fred Haise during lunar surface simulation training
- 28/01/1970 Apollo 13 astronauts participate in walk-through of EVA timeline at KSC
- 02/04/1970 Astronaut Fred Haise simulates lunar surface EVA during training exercise
- 02/04/1970 Apollo 13 crewmen simulate lunar surface EVA during training exercise
- 17/04/1970 View of Mission Control Center during Apollo 13 splashdown
- 17/04/1970 View of Mission Control Center during Apollo 13 splashdown
- 17/04/1970 View of Mission Control Center during Apollo 13 splashdown
- 17/04/1970 President Richard Nixon visits MSC to award Apollo 13 Mission Operations team
- 17/04/1970 View of Mission Control Center during Apollo 13 splashdown
- 20/04/1970 Apollo 13 crewmen during post flight debriefing activity at MSC
- 04/07/1970 Astronaut Fred Haise participates in simulation training
- 11/09/1970 High angle view of Apollo 14 space vehicle on way to Pad A
- 11/09/1970 High angle view of Apollo 14 space vehicle on way to Pad A
- 11/09/1970 Apollo 14 space vehicle arrives at Pad A at KSC during roll out from VAB
- 11/09/1970 Ground level view of Apollo 14 space vehicle leaving VAB for launch pad
- 04/11/1970 Apollo 13 crewmembers in suiting room prior to launch
- 04/11/1970 Astronaut Fred Haise in suiting room prior to launch
- 04/01/1971 Astronaut David Scott looks at Lunar Rover no.1 attached to Lunar Module 10
- 29/01/1971 Members of Apollo 15 crew shown with Lunar Roving Vehicle One-G trainer
- 21/04/1971 View of Apollo 15 Lunar Roving Vehicle and Lunar Module during simulations
- 13/05/1971 View of Apollo 15 space vehicle on Pad A, Launch Complex 39
- 26/07/1971 Apollo 15 crew during suiting up operations at KSC prior to launch
- 29/07/1971 Apollo 15 news briefing
- 05/11/1971 View of Apollo 15 space vehicle leaving VAB to Pad A, Launch Complex 39
- 05/11/1971 View of Apollo 15 space vehicle on way from VAB to Pad A, Launch Complex 39
- 29/03/1972 View of Apollo 16 space vehicle at Pad A, Launch Complex 39
- 28/08/1972 Apollo 17 rollout to launch pad
- 02/11/1972 View of Apollo 16 space vehicle on way from VAB to Pad A, Launch Complex 39
- 18/11/1974 President Kennedy briefed on operation of Mercury Control Center
- 16/10/1975 Flight Director Kraft discusses MA-8 flight with Cooper and Schirra
- 16/10/1975 Astronaut Schirra and Flight Director Kraft discuss MA-8 flight plan
- 14/12/1976 Future site of the Manned Spacecraft Center, Houston, Texas
- 19/07/1989 JSC Speakers Program personnel Talking on "Planning the Apollo Missions"
- 20/07/1989 Apollo 11 Anniversary activities
- 26/07/1989 Apollo astronaut Mike Collins at the 20th Anniversary observance
- 20/04/1990 Langley Storage facility which housed remains of Apollo 204 craft
|