Image Index
Florida
- Walter Schirra and Walter Williams at Mercury 7 memorial
- Wide angle view of thef Mercury 7 memorial dedication
- 31/01/1961 Recovery of Mercury spacecraft and chimpanzee Ham after MR-2 flight
- 21/02/1961 Launch of Mercury-Atlas 2 vehicle on Feb. 21, 1961
- 26/04/1961 Astronaut Virgil Grissom during water egress training
- 26/04/1961 Astronaut Virgil Grissom in new Mercury Space Suit during egress training
- 26/04/1961 Mercury capsule mock-up suspended from ship during water egress training
- 05/05/1961 Launch of the MR-3 missile
- 05/05/1961 Launch of the MR-3 spacecraft
- 07/05/1961 Astronaut John Glenn has blood drawn during training
- 21/06/1961 Mercury-Redstone 4 spacecraft launching
- 22/07/1961 Astronaut John Glenn has biosensor attached to body during training
- 27/07/1961 Launch of the MR-3 spacecraft
- 27/07/1961 Launch of the MR-3 spacecraft
- 08/09/1961 Mercury-Redstone 4 spacecraft in last moments of countdown before launch
- 08/10/1961 Launch of Mercury-Redstone vehicle 2 on Jan. 21, 1961
- 08/10/1961 Mercury-Redstone 4 spacecraft launching
- 08/10/1961 Mercury-Redstone 4 spacecraft launching
- 23/02/1962 President Kennedy after presenting John Glenn with NASA Service Award
- 16/03/1962 Astronaut Scott Carpenter completes top egress training in white room
- 18/04/1962 Astronauts Scott Carpenter and Walter Schirra completes water egress test
- 18/04/1962 Astronaut Scott Carpenter completes water egress test
- 10/05/1962 Launch of the Mercury-Atlas 8 mission
- 24/05/1962 Launch of the Mercury-Atlas 7 mission
- 24/05/1962 Astronaut Scott Carpenter leaving White Room for launch site
- 20/07/1962 Astronaut Scott Carpenter completes water egress test
- 19/09/1962 Astronaut Scott Carpenter receives NASA Distinguised Service Medal
- 19/09/1962 Astronaut Scott Carpenter receives parade in Boulder, Colorado
- 25/09/1962 Launch of the Mercury-Atlas 7 mission
- 07/10/1962 Astronaut Scott Carpenter has biosensors attached to body during training
- 09/10/1962 View of Mercury Control Center prior to MA-8 flight
- 09/10/1962 Astronaut L. Gordon Cooper on weight and balance scale
- 29/10/1962 Launch of the Mercury-Atlas 8 mission
- 03/01/1963 Astronaut Gordon Cooper and technicians watch Atlas 130D hoisted into place
- 12/11/1963 Launch of the MR-2 spacecraft
- 23/12/1963 Aerial oblique artist concept of the Merritt Island Launch Complex
- 27/02/1964 Astronaut Virgil Grissom in new Mercury Space Suit
- 04/08/1964 Gemini/Titan-II launch vehicle #1 liftoff at Cape Kennedy, Florida.
- 04/08/1964 Aerial view Gemini/Titan-II launch vehicle #1 liftoff at Cape Kennedy
- 13/08/1964 Radio Frequency Interference Test at Launch Complex 37A
- 18/09/1964 Launch of Saturn 7 at Launch Complex 37, Merritt Island launch area, Florida
- 02/12/1964 Astronaut Gordon Cooper participates in pre-flight simulation training
- 25/01/1965 Astronaut Walter Schirra in cockpit of Gemini simulator
- 06/03/1965 Mission Control Center at Cape Kennedy during Gemini 4
- 06/03/1965 Fisheye view of Gemini 4 prime crew during simulated exercises at Pad 19
- 14/04/1965 Liftoff of Gemini-Titan 3 mission
- 29/04/1965 Nighttime scene of Gemini spacecraft being hoisted to top of Pad 19
- 02/05/1965 Views of the Gemini 3 spacecraft in Merritt Island Launch Area
- 02/05/1965 Astronauts Grissom and Young discuss test plan prior to communications test
- 02/05/1965 Astronauts Young and Grissom during communications test of Gemini spacecraft
- 05/06/1965 Astronauts Grissom and Young inside their Gemini spacecraft before launch
- 08/06/1965 Astronauts Cooper and Conrad during simulation exercise for Gemini 5 mission
- 21/06/1965 Photograph of the coast line of Florida and Cape Kennedy from Gemini 4
- 05/07/1965 Astronauts McDivitt and White look over training plans
- 19/08/1965 Astronauts Conrad and Cooper during suiting up operations
- 21/08/1965 View of Cape Kennedy, Florida from Gemini 5
- 30/08/1965 Astronaut Charles Conrad during suiting up on morning of liftoff of Gemini 5
- 30/08/1965 Preflight breakfast for Gemini 5 prime crew
- 22/10/1965 Astronauts Stafford and Schirra during suiting up exercises at the Cape
- 25/10/1965 Astronauts Stafford and Schirra at breakfast before Gemini 6 mission
- 12/12/1965 Polaris, underwater launch off Florida as seenn from Gemini 7
- 12/12/1965 Kennedy Space Center area as seen from Gemini 7 during Gemini 6 abort
- 15/12/1965 Astronauts Stafford and Schirra at breakfast before Gemini 6 mission
- 15/12/1965 View of the interior of the Mission Control Center at KSC during Gemini 6
- 15/12/1965 Launch of the Gemini 6 spacecraft
- 17/12/1965 Gemini 6 astronauts welcomed on arrival at Cape Kennedy
- 07/01/1966 Astronauts Young and Collins beside suiting trailer during preflight activity
- 18/02/1966 Astronaut Neil Armstrong undergoes weight and balance tests
- 26/02/1966 Apollo/Saturn 201 launched from Kennedy Space Center
- 06/03/1966 Launch of Gemini 9 spacecraft
- 06/03/1966 Launch of Gemini 9 spacecraft
- 16/03/1966 Gemini 8 spacecraft launched from Kennedy Space Center
- 16/03/1966 Gemini 8 spacecraft launched from Kennedy Space Center
- 06/05/1966 Mississippi River delta as seen from the Gemini 9-A spacecraft
- 07/05/1966 Liftoff of Saturn Mission 203
- 17/05/1966 Agena Target Vehicle atop Atlas Launch vehicle launched from KSC
- 17/05/1966 Earl Warren and James Webb converse while waiting for Gemini 9 liftoff
- 19/05/1966 Gemini Augmented Target Docking Adapter during pre-flight checkout
- 25/05/1966 First night launch of a Saturn I launch vehicle
- 16/07/1966 Astronauts Young and Collins outside KSC Mission Control Center
- 18/07/1966 Launch of the Gemini 10 spacecraft
- 15/08/1966 A stage of the uprated Saturn 1 launch vehicle arrives by barge at Cape Kennedy
- 25/08/1966 Apollo/Saturn Mission 202 launch
- 25/08/1966 KSC Launch Complex 34 during Apollo/Saturn Mission 202 pre-launch alert
- 11/09/1966 Momument at Pad 14 honoring Project Mercury
- 14/09/1966 Central portion of Florida, Gulf of Mexico seen from Gemini 11
- 08/10/1966 Astronaut Richard Gordon practices attaching camera to film EVA
- 18/10/1966 Astronaut Edward White receives help from technician during tests at KSC
- 18/10/1966 NASA suit technicians assist Astronaut Virgil Grissom during suiting
- 03/11/1966 Astronauts Armstrong and Scott during photo session outside KSC
- 03/11/1966 Astronauts Armstrong and Scott during photo session outside KSC
- 11/11/1966 Liftoff of the Gemini 12 spacecraft
- 13/11/1966 Florida, Bahama Islands, Cuba as seen from Gemini 12 spacecraft
- 16/11/1966 Astronauts Lovell and Aldrin shake hands in front of Gemini progress sign
- 09/12/1966 Gemini 11 spacecraft at Launch Complex 19
- 09/12/1966 Launch of Gemini 11 spacecraft from Launch Complex 19
- 09/12/1966 Laundh of Gemini 11 spacecraft from Launch Complex 19
- 11/12/1966 Cape Kennedy, Palm Beach, Orlando area of Florida as seen from Gemini 12
- 12/12/1966 Apollo 1 prime crew in spacesuits at the launch complex
- 01/03/1967 Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
- 01/03/1967 Apollo Spacecraft 012 Command/Service Module being moved to Operations bldg
- 20/06/1967 Apollo Spacecraft 017 moved for mating with Saturn V launch vehicle
- 11/09/1967 Apollo 4 unmanned mission launched from Pad A, Launch Complex 39
- 11/09/1967 Launching of the Apollo 4 unmanned space mission
- 11/09/1967 Apollo 4 unmanned mission launched from Pad A, Launch Complex 39
- 22/11/1967 Mating of Lunar Module-1 with Spacecraft Lunar Module Adapter-7
- 22/01/1968 Crew members for first manned Apollo flight at unmanned mission launch
- 12/03/1968 First stage of Saturn launch vehicle in KSC Vehicle Assembly Building
- 12/03/1968 Apollo spacecraft Command/Service Module and Lunar Module 3 arrive at VAB
- 04/04/1968 Apollo 6 unmanned space mission launch
- 22/04/1968 KSC Pad 34 showing erection of first stage of Saturn 205 launch vehicle
- 07/05/1968 Astronaut John Young ingresses Apollo spacecraft command module in training
- 08/05/1968 Apollo Spacecraft 101 Command/Service Modules being moved for mating
- 02/06/1968 Apollo 6 stack and mobile launch tower leaving VAB on way to launch pad
- 27/08/1968 Interior view of Manned Spacecraft Operations Bldg with Lunar Module-3
- 10/10/1968 Nighttime view of Apollo 7 spacecraft at Launch Complex 34
- 10/11/1968 Apollo 7/S-IVB Rendezvous in space
- 10/11/1968 Launch of the Apollo 7 spacecraft
- 10/11/1968 Apollo 7 prime crew goes through suiting up operations prior to launch
- 10/11/1968 Launch of the Apollo 7 spacecraft
- 13/11/1968 Apollo 8 prime crew inside simulator at KCS during training preparations
- 20/11/1968 Interior view of Manned Spacecraft Operations Bldg with Lunar Module-3
- 30/11/1968 Interior Manned Spacecraft Operations Bldg as Command/Service module moves
- 10/12/1968 Atlantic coastline of Florida as seen from the Apollo 7 spacecraft
- 21/12/1968 Launch of Apollo 8 lunar orbit mission
- 21/12/1968 Launch of Apollo 8 lunar orbit mission
- 21/12/1968 Launch of Apollo 8 lunar orbit mission
- 07/01/1969 Aerial view of Apollo 11 spacecraft on launch pad A
- 13/01/1969 Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
- 13/01/1969 Lunar Module 4 moved for mating with Lunar Module Adapter at KSC
- 23/02/1969 Fish-eye view of interior of Apollo Lunar Module Mission Simulator at KSC
- 23/02/1969 Apollo 9 crew prepares to participate in Countdown Demonstration Test
- 23/02/1969 View of White Room atop Pad A during Apollo 9 Countdown Demonstration Test
- 23/02/1969 Firing Room 2 in Launch Control Center at KSC during Apollo 9 countdown test
- 23/02/1969 Nighttime view of Apollo 9 space vehicle at Pad A, Launch Complex 39
- 24/02/1969 Apollo 9 simulator training
- 01/03/1969 Aerial view of Apollo 9 space vehicle on way from VAB to Pad A
- 03/03/1969 Liftoff of the Apollo 9 space vehicle
- 03/03/1969 Apollo 9 crew leaves Spacecraft Operations Building during countdown
- 03/03/1969 Technicians prepare to insert Apollo 9 crew during Countdown Demonstration
- 04/03/1969 Portrait of the Apollo 10 prime crew
- 24/03/1969 Apollo 11 prime crew during manned altitude chamber test activity
- 27/03/1969 Apollo 10 Astronauts participate in pad egress training at KSC
- 01/04/1969 Lunar Module 5 ascent stage in Final Assembly area on overhead hoist
- 04/04/1969 Lunar Module 5 ascent stage being moved for mating with adapter
- 05/04/1969 Ground level view of Apollo 10 on Pad B, Launch Complex 39, KSC
- 05/04/1969 Nighttime view of Apollo 10 space vehicle on Pad B, Launch Complex 39
- 05/04/1969 Aerial, high-angle view of Apollo 10 on Pad B, Launch Complex 39, KSC
- 06/04/1969 Lunar Module 5 mated with Spacecraft Lunar Module Adapter (SLA)
- 13/05/1969 Aerial, high-angle view of Apollo 10 on Pad B, Launch Complex 39, KSC
- 13/05/1969 Firing Room 3 of Launch Control Center, Launch Complex 39 countdown test
- 13/05/1969 Portrait of the Apollo 10 prime crew
- 17/05/1969 Ground level view of Apollo 10 on Pad B, Launch Complex 39, KSC
- 17/05/1969 Ground level view of Apollo 10 on Pad B, Launch Complex 39, KSC
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Astronaut John Young during final suiting operations for Apollo 10 mission
- 18/05/1969 Apollo 10 astronauts during preflight operations for Apollo 10 mission
- 18/05/1969 Launch of the Apollo 10 space vehicle
- 05/06/1969 Apollo 10 astronauts leave Manned Spacecraft Operations Bldg for launch pad
- 10/06/1969 Apollo 12 crewmembers participate in lunar surface extravehicular simulations
- 10/06/1969 Apollo 12 crewmembers participate in lunar surface extravehicular simulations
- 19/06/1969 Astronaut Neil Armstrong participates in simulation training
- 23/06/1969 Lunar Module 6 being moved to integration work stand
- 25/06/1969 Astronaut Edwin Aldrin in EMU verifies fit of Portable Life Support System
- 30/06/1969 Apollo 12 spacecraft arrives at VAB during preflight preparations
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 16/07/1969 Apollo 11 crewmen during prelaunch countdown
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 16/07/1969 Apollo 11 crewmen during prelaunch countdown
- 16/07/1969 Liftoff of the Apollo 11 lunar landing mission
- 09/08/1969 Ground level view of Launch Complex 39 and Apollo 12 spacecraft
- 09/08/1969 High-angle view of Launch Complex 39 and Apollo 12 spacecraft
- 10/09/1969 Apollo 12 crewmembers participate in lunar surface extravehicular simulations
- 22/10/1969 Astronaut Richard Gordon participates in simulation training
- 22/10/1969 Apollo 12 crewmembers shown in Apollo Lunar Module Mission Simulator
- 28/10/1969 Nighttime, ground level view of Launch Complex 39 and Apollo 12 spacecraft
- 03/11/1969 View of the Apollo 10 space vehicle at Pad B, ready for launch
- 03/11/1969 Apollo 10 roll out to Pad B, Launch Complex 39, Kennedy Space Center
- 03/11/1969 Aerial view of Launch Complex 39, KSC showing Apollo 10 on way to Pad B
- 04/11/1969 View of Apollo Spacecraft 107 Command and Service Modules at KSC
- 14/11/1969 Launch of the Apollo 12 lunar landing mission
- 14/11/1969 White room atop Pad A, Launch Complex 39 during insertion of Apollo 12 crew
- 14/11/1969 Lightning bolt during the launch of the Apollo 12 lunar landing mission
- 14/11/1969 Launch of the Apollo 12 lunar landing mission
- 14/11/1969 Launch of the Apollo 12 lunar landing mission
- 28/01/1970 Apollo 13 astronauts participate in walk-through of EVA timeline at KSC
- 24/03/1970 Apollo 13 space vehicle during Countdown Demonstration Test
- 02/04/1970 Astronaut Fred Haise simulates lunar surface EVA during training exercise
- 02/04/1970 Apollo 13 crewmen simulate lunar surface EVA during training exercise
- 04/07/1970 Astronaut Fred Haise participates in simulation training
- 15/07/1970 Fish-eye lens view Astronauts Shepard and Mitchell in Lunar Module Simulator
- 16/07/1970 Apollo 14 prime crew standing in front of a Lunar Module mock-up
- 21/07/1970 Astronaut Alan B. Shepard in lunar surface simulation training
- 21/07/1970 Astronaut Alan B. Shepard in lunar surface simulation training
- 11/09/1970 High angle view of Apollo 14 space vehicle on way to Pad A
- 11/09/1970 High angle view of Apollo 14 space vehicle on way to Pad A
- 11/09/1970 Apollo 14 space vehicle arrives at Pad A at KSC during roll out from VAB
- 11/09/1970 Ground level view of Apollo 14 space vehicle leaving VAB for launch pad
- 04/11/1970 Apollo 13 crewmembers in suiting room prior to launch
- 04/11/1970 Launching of the Apollo 13 lunar landing mission
- 04/11/1970 Launching of the Apollo 13 lunar landing mission
- 04/11/1970 Astronaut Fred Haise in suiting room prior to launch
- 04/01/1971 Astronaut David Scott looks at Lunar Rover no.1 attached to Lunar Module 10
- 26/03/1971 Apollo 15 crewmen inside Apollo 15 Command Module during simulation
- 21/04/1971 View of Apollo 15 Lunar Roving Vehicle and Lunar Module during simulations
- 13/05/1971 View of Apollo 15 space vehicle on Pad A, Launch Complex 39
- 24/05/1971 Astronaut David Scott simulates use of Apollo 15 Lunar Surface Drill at KSC
- 27/06/1971 Launch of the Apollo 15 space vehicle
- 27/06/1971 Launch of the Apollo 15 space vehicle
- 30/06/1971 Astronauts Scott and Irwin shown on Lunar Roving Vehicle at KSC
- 25/07/1971 Lightning around the Apollo 15 stack prior to launch
- 26/07/1971 Apollo 15 crew during suiting up operations at KSC prior to launch
- 05/11/1971 View of Apollo 15 space vehicle leaving VAB to Pad A, Launch Complex 39
- 05/11/1971 View of Apollo 15 space vehicle on way from VAB to Pad A, Launch Complex 39
- 22/03/1972 Astronaut Charles Duke trains with core tube on simulated lunar surface
- 29/03/1972 View of Apollo 16 space vehicle at Pad A, Launch Complex 39
- 04/04/1972 Astronauts Young and Duke participate in training with Lunar Roving Vehicle
- 16/04/1972 Apollo 16 liftoff
- 16/04/1972 Apollo 16 liftoff
- 12/07/1972 Launch of the Apollo 17 lunar landing mission
- 12/07/1972 Launch of the Apollo 17 lunar landing mission
- 06/08/1972 Apollo 17 Astronaut Eugene Cernan during EVA training
- 28/08/1972 Apollo 17 rollout to launch pad
- 02/09/1972 Astronaut John Young participates in lunar surface EVA training at KSC
- 13/09/1972 Apollo 17 crewmen during EVA training
- 02/11/1972 View of Apollo 16 space vehicle on way from VAB to Pad A, Launch Complex 39
- 30/11/1972 Nighttime scene at Pad A, Launch Complex 39 showing Apollo 17 space vehicle
- 18/11/1974 President Kennedy briefed on operation of Mercury Control Center
- 18/01/1990 Close-up view of Mercury-Atlas 4 at Cape Canaveral
|